Christian Men's Fellowship, Oct 15, 2019

We started at 8 am and completed this project by 1 pm. It was hot with limited shade. We took a lot of water breaks.

It took longer than usual because we had a much smaller crew than those we have had recently ( 7 versus 21).

One factor that required more time and effort was the repositioning of the existing front steps.

The project included a 5-ft x 5-ft Deck and a 40-foot ramp.

We were able to eliminate an additional deck by extending the ramp directly along the residence.